In 2019, we developed a small exchange model for electrical flexibility. For an industrial energy platform spanning many sites, I would now start with the Common Information Model (CIM), rather than develop another proprietary language.
A battery capable of delivering 100 kW is an interesting asset. A hundred batteries capable of delivering 100 kW each are an interesting portfolio. But knowing their combined power tells us surprisingly little about whether they can resolve a particular congestion problem, fulfil a market commitment or operate without violating local constraints.
For that we need to know where the assets are connected, what their capabilities are at a particular time, which commitments already exist and who is responsible for their operation. The information has to remain meaningful when it moves between manufacturers, sites, energy management systems and external parties.
I encountered a smaller version of this problem in 2019. We needed to coordinate electrical flexibility across different energy installations, so we developed a simple exchange format independent of their technical interfaces. We sometimes compared it to Esperanto: a shared language between systems that otherwise speak different technical languages.
We deliberately limited the model to three functions: flexible energy volume, curtailment and controllable power. We were not trying to describe the complete operation of an installation or define its communication and security infrastructure. That approach made sense for the requirements at the time. Looking at the wider challenge of industrial energy platforms today, I would investigate an established energy-sector information model before extending such a format ourselves.
From controlling a site to coordinating a portfolio
Consider a hypothetical industrial site with a 400 kW electricity import limit. Its energy management system expects demand to reach 460 kW during the next fifteen minutes. Reducing EV charging by 35 kW and discharging a battery at 25 kW could bring import back to the connection limit, provided those adjustments remain feasible throughout the interval.
The local controller needs to know whether the vehicles can still meet their charging requirements, whether the battery has sufficient energy and whether other production obligations allow the intervention. The arithmetic is easy; establishing that the numbers represent achievable behaviour is rather more difficult.
Now imagine that the same company operates several industrial sites, each with different connection limits, tariffs, equipment and production schedules. It may also offer flexibility to an aggregator or grid operator. A reduction at one site cannot automatically compensate for a physical connection overload at another. The portfolio optimiser needs to understand electrical location, applicable restrictions and the purpose of each requested adjustment.
At this scale, a common flexibility message remains useful, but it needs a broader semantic foundation. Otherwise every new application has to reconstruct the relationships between assets, sites, meters, contracts and electrical connections. That is precisely the kind of integration work a common information model is intended to reduce.
What is the Common Information Model (CIM)?
The IEC Common Information Model is a family of power-sector information models that gives independently developed applications a shared vocabulary for electrical resources and their relationships. IEC 61970-301 defines the base model; the IEC 61968 family addresses distribution and enterprise integration, while IEC 62325 addresses electricity-market information exchange.
CIM is not a single payload that every device must implement. A profile selects the objects, properties and relationships needed for a particular exchange. Applications can retain their own internal data structures and translate at agreed boundaries. This distinction is essential if a multi-site platform is to remain manageable.
The use of CIM is well established in electricity-network information exchange. ENTSO-E’s Common Grid Model Exchange Standard (CGMES), for example, supports the exchange of grid models used in system operation and development. An industrial asset platform does not need to implement CGMES in its entirety, but its existence demonstrates why electrical relationships are worth modelling explicitly.
CIM already addresses distributed energy flexibility
It would be misleading to present CIM purely as a static asset register. Two standards are particularly relevant when evaluating it for a modern industrial energy platform.
| Standard | Architectural relevance |
|---|---|
| IEC 61970-301 | Common semantics for electrical resources, their characteristics and relationships. |
| IEC 61968-5:2020 | Enterprise-level distributed energy optimisation, including resource groups, capabilities, monitoring, forecasts and dispatch. |
| IEC 62746-4:2024 | CIM-based demand-side resource interface profiles for exchanges involving customer energy management and power management systems. |
IEC 61968-5 is particularly useful when coordinating distributed energy resources through a DER management system. Its scope includes aggregated resource capabilities and dispatch, but excludes the communication with individual devices. IEC 62746-4 complements the wider CIM family with demand-side resource profiles, making it a credible candidate for the boundary between customer-side energy management and the wider electricity system.
Neither standard automatically delivers a working industrial energy management platform. The relevant profiles must be selected and checked against the actual use cases. Nevertheless, these standards give us a much better starting point than assuming that every organisation must invent its own definitions for distributed resource groups and their coordination.
Keep the original flexibility model small
The three functions we needed in 2019 remain useful requirements for evaluating a CIM-based architecture.
| Function | What must be unambiguous |
|---|---|
| Flexible energy volume (kWh) | Available energy, direction, applicable period and reference schedule where relevant. |
| Curtailment | Whether production or consumption is being reduced, by how much and for how long. |
| Controllable power (kW) | Permitted adjustment, timing, duration, ramp and operating restrictions. |
An installation offering 200 kWh of flexibility over four hours does not necessarily offer 200 kW of instantaneous adjustment. Likewise, curtailing solar production during an electricity import peak can make the situation worse. A platform needs consistent definitions for direction, units, time intervals and reference schedules before it can compare or aggregate offers.
I would start by mapping these three requirements against the relevant CIM profiles, identifying what is already covered and where an explicit extension or a specialised resource interface is necessary. This is a proposed engineering exercise, not a claim that every field in our original model has a verified one-to-one CIM equivalent.
The objective is to reduce the proprietary model we maintain, not to replace a small interface with hundreds of unnecessary classes. A limited, versioned profile with clear validation rules is preferable to exposing the entire CIM model to every application.
A practical CIM implementation mapping
For a multi-site platform, I would begin with the information that actually crosses the boundary between local energy management and portfolio coordination. The following mapping uses IEC 61970-301 for common electrical semantics, IEC 61968-5 for distributed energy resource (DER) group exchanges and IEC 62746-4 as a candidate for demand-side resource exchanges.
| Information requirement | CIM-oriented design | What the implementation must establish |
|---|---|---|
| Resource identity and electrical location | CIM resource, equipment and connectivity relationships (IEC 61970-301). | Stable identifiers and the correct connection point, site and portfolio membership. |
| Actual power and energy | CIM-aligned measurement semantics; time-series contracts for operational telemetry. | Units, import/export convention, timestamps, quality and measurement point. |
| Available flexibility and curtailment | IEC 61968-5 group capability and forecast exchanges; evaluate IEC 62746-4 for demand-side resources. | Feasible power and energy over time, reference schedule, direction and local constraints. |
| Aggregation across sites | IEC 61968-5 DER group creation, membership and status. | Electrical and contractual eligibility; avoid counting the same flexibility twice. |
| Requested power adjustment | IEC 61968-5 group dispatch exchanges; local EMS translates the request into resource actions. | Requested time interval, applicable limits, authorisation and local acceptance. |
| Execution and verification | IEC 61968-5 group status exchanges correlated with measured response and dispatch records. | Distinguish acceptance from actual delivery, including partial execution, stale data and failure. |
In the 400 kW example, the portfolio platform needs to know that the site expects 460 kW of import and can offer a combined reduction of 60 kW for the required interval. The local energy management system (EMS) determines whether the charging infrastructure can reduce demand by 35 kW and the battery can supply 25 kW. The platform then checks the measured response against the requested outcome. It does not need to know how either device implements its internal control.
This is a conceptual mapping of responsibilities, not a validated CIM class or message schema. In particular, IEC 61968-5 concerns enterprise-level DER group exchanges, not direct control of individual devices. The exact profile version, fields and any extensions must be checked against the applicable specifications and tested with actual systems.
Where the other standards fit
Industrial assets will continue to use different communication protocols. Charging infrastructure commonly uses OCPP, batteries and solar inverters may expose Modbus or SunSpec interfaces, and industrial equipment may use OPC UA. These technologies remain useful when the platform adopts CIM. Their purpose is different.
| Technology | Preferred responsibility |
|---|---|
| CIM | Shared electrical and portfolio semantics, resource relationships and relevant coordination profiles. |
| OPC UA | Industrial information models, measurements and equipment interfaces. |
| OCPP | Charging infrastructure communication and management. |
| Modbus / SunSpec | Equipment measurements, parameters and device integration. |
| OpenADR | Demand response events and related signals with external parties where appropriate. |
| S2 | Specialised flexibility coordination between a customer energy manager and resource managers within premises. |
| Asset Administration Shell (AAS) | Asset descriptions and specialised industrial submodels, including energy flexibility. |
| Unified Namespace / MQTT | Discoverable operational information and event distribution; MQTT is a transport protocol, UNS an architectural pattern. |
Adapters remain necessary for equipment that does not implement the chosen exchange profiles. Their responsibility is to translate the available device data into the platform’s shared semantics without losing units, direction, quality or operational restrictions. This is work worth doing once at a well-defined boundary rather than repeating it in every consuming application.
A Unified Namespace makes information accessible, not necessarily understandable

A Unified Namespace (UNS) can be a useful way to organise operational information across sites, assets and applications. It is commonly implemented using publish-subscribe infrastructure, such as MQTT, although the architectural pattern does not require a single central broker.
Suppose a topic is named Site01/Battery01/Power. We can find the information, but the topic alone does not tell us whether positive power represents import or export, whether the value is a measurement or a requested setpoint, or how the battery relates to an electrical connection and a flexibility portfolio.
A namespace hierarchy also represents containment more naturally than electrical connectivity. The same asset can belong to a physical site, an electrical feeder, a maintenance portfolio and a commercial aggregation group. These relationships need explicit modelling and stable identifiers rather than additional copies of the same measurement under different topic names.
In a CIM-based architecture I would use the appropriate CIM-derived semantics in versioned event contracts and maintain references to authoritative asset and network information. A namespace can then expose the information without becoming the sole owner of it. The choice of event infrastructure, historical storage and API design remains separate from the choice of semantic model.
S2 and AAS still have a place in industrial energy management
S2, originally standardised in Europe and now specified internationally in IEC 63402-2-2:2026, defines the information and interactions between a customer energy manager and resource managers within a premises. Its control models can be useful for power envelopes, storage behaviour and operating modes. I would consider it for homes, commercial buildings and suitable local industrial resource interfaces. It is not my first choice for the overarching information model of a multi-site industrial portfolio. The IEC specification also leaves concrete message formats, transport mappings and security mechanisms to implementation.
For industrial assets, the IDTA 02076 Energy Flexibility Data Model is another relevant development. This AAS submodel describes industrial flexibility, including dependencies and constraints that arise from production processes. An energy manager may need these descriptions to establish whether an otherwise technically flexible machine can actually change its operation.
I would not assume that these models automatically interoperate. Where S2 or AAS is used, the mapping to the portfolio’s CIM-based exchange model must preserve the intended behaviour and identify any information that cannot be represented without additional semantics.
The Dutch technical agreements for smart devices address complementary requirements. NTA 8043 concerns smart private charging equipment and services; NTA 8171 concerns smart heat pump installations within its defined scope, including the 70 kW thermal-output limit. Neither should be treated as a universal industrial communication protocol or assumed to apply to every industrial installation.
How to design a multi-site asset platform
The central platform needs a consistent understanding of electrical resources, their relationships and current or forecast capabilities. It should use that information to coordinate sites and portfolios without taking over the technical operation of every installation.

The diagram follows the Purdue level names used in NIST’s example of OT network segmentation. Operators, aggregators and market systems are external parties rather than Level 5 itself. The CIM-based portfolio platform is shown at enterprise level, with site business planning at Level 4 and local operations below the industrial demilitarised zone (DMZ). This is a functional mapping, not a prescribed network design. Only approved gateways or relays should cross security boundaries; a Unified Namespace need not reside entirely within the DMZ.
At portfolio level I would use relevant CIM profiles for asset relationships, group capabilities, forecasts and dispatch exchanges. At each site the local EMS remains responsible for respecting electrical connection limits, production constraints and the actual capabilities of its resources. It may use S2 or industrial asset models where those offer a practical benefit.
Telemetry and events must include sufficient context to be interpreted reliably: identifiers, timestamps, units, quality, validity and origin. Not every high-frequency sensor reading needs to be converted into a comprehensive CIM object. For time-series storage or fast control, specialised data structures may be more efficient, provided their meaning and relationship to the semantic model remain clear.
External flexibility commitments need an authoritative record and reconciliation with local availability. A central optimiser must not sell the same flexibility twice or assume that a resource at one site can resolve a connection constraint at another. These are operational and commercial responsibilities that an information standard can help express but cannot enforce on its own.
The related articles Smart Grid Strategy: Turn Energy Data Into Decisions and Real-Time Data: The Critical Enabler of the Energy Transition explore the importance of translating timely, reliable data into operational decisions.
Local control must survive a failure of the central platform
A portfolio management platform can coordinate flexibility over seconds, minutes or hours. Electrical protection and safety-critical industrial control operate under different requirements and must not rely on a central optimisation service or message broker being available.
A dispatch instruction is not evidence that an adjustment has taken place. The local system needs to validate that the requested behaviour is permitted, execute it where feasible and report the outcome. The central platform must distinguish between an accepted request, actual measured response and a failed or partially completed action.
Where communications are interrupted or information becomes stale, the local controllers must continue operating within their defined safe limits and fallback policies. Restoring the connection should not cause old commands to be executed without checking their validity. These responsibilities belong in the operational architecture, irrespective of whether the information is represented using CIM, S2 or a proprietary model.
Which standard would I choose in practice?
| Application | Preferred starting point |
|---|---|
| Residential energy management | S2 where device and EMS support is available. |
| Commercial building energy management | S2 or appropriate building and device interfaces. |
| Industrial energy hub | Local EMS with suitable S2 or AAS flexibility models; CIM for wider system exchanges where needed. |
| Industrial multi-site asset platform | CIM-based semantic foundation; specialised local interfaces. |
| Virtual power plant / DER portfolio | Relevant CIM profiles for portfolio and external coordination. |
| DSO / TSO information platform | CIM and the applicable grid exchange profiles. |
| Enterprise realtime information distribution | Optional UNS with governed domain semantics. |
These are architectural preferences, not universal prescriptions. The selected interfaces must be justified by the use case, existing systems, supplier support and the required operational guarantees.
Test the profile before committing to a migration
For an existing multi-site platform I would compare three options: retaining the current exchange model, introducing CIM at external or portfolio boundaries, and gradually adopting a CIM-based common model across applications. The comparison should use the same assets and operational scenarios, not compare a working lightweight interface with the entire CIM specification.
The first test is whether the chosen profile preserves the original requirements for controllable power, curtailment and flexible energy, including their meaning relative to schedules and time intervals. The next test introduces multiple sites and resource groups, conflicting commitments, electrical limits and changes in availability. Where S2 or AAS is used, the mapping should be tested in both directions for information loss.
Failure scenarios matter just as much as successful dispatch. Test stale measurements, loss of connectivity, partial execution, conflicting requests and recovery without unsafe replay. Measure the effort to onboard another device or supplier, the cost of maintaining profiles and adapters, and the ability to replace a component without changing every consuming application.
CIM has a substantial modelling and governance cost if an organisation adopts more than it needs. A proprietary interface may still be the economical choice for a stable, narrowly scoped application. For new industrial multi-site platforms, however, the wider context and established coordination profiles make CIM the first option I would evaluate. If a practical trial shows that it introduces more complexity than it removes, the scope of adoption should change.
One electrical system, several useful languages
The architectural problem we faced in 2019 has not disappeared. It has become broader as energy assets are coordinated across sites, portfolios and organisational boundaries.
For that broader problem I prefer the Common Information Model as the semantic backbone. I would retain specialised resource interfaces, consider S2 for local energy coordination and AAS for industrial flexibility descriptions, and use a Unified Namespace where it helps distribute governed information. None of these choices removes the need for reliable local operational control.
The value of a common model is not measured by the number of classes we implement. It is measured by the number of integration problems we no longer need to solve separately, while preserving the operational context that makes flexibility useful in the first place.
References and further reading
- NIST SP 800-82 Rev. 3 (2023) — Guide to Operational Technology (OT) Security, Figure 16
- IEC 61970-301:2020 — CIM Base
- IEC 61968-5:2020 — Distributed Energy Optimization
- IEC 62746-4:2024 — Demand Side Resource Interface
- ENTSO-E — CGMES Library
- IEC 63402-2-2:2026 — S2 interface
- S2 documentation — Control types
- IDTA — AAS submodels, including Energy Flexibility Data Model (02076)
- OPC Foundation — OPC UA
- Open Charge Alliance — OCPP
- OpenADR Alliance
- NEN — Smart Grid-Intensive Devices